Solonichki — Bolshaya Mikhailovka — section of the Kazakhstan railway.
In the 1980s, according to the Lengiprotrans project, the modernization of signaling devices on the railway section and...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Ekibastuz II - station of the Kazakhstan railway in the area of a large coal deposit.
In 1970-1980, within the framework of the construction of railway approaches to the Ekibastuz industrial...
Baigul - Karazhal - a section of the Karaganda - Karazhal line of the Kazakhstan railway.
In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 3...
In the 1980s, Lengiprotrans engineers worked on a project to reconstruct a road bridge across the supply canal on the road to the Estonian State District Power Plant. This project was carried out...
In the 1980s, Lengiprotrans developed a project for the Obskaya — Bovanenkovo line, the northernmost railway in the world. The route starts from the Obskaya station, which is part of the...
Kokchetav (Kokshetau) - Novoishimskaya - a section of the former Tselinnaya railway.
The site was electrified using a 2x25 kV AC system under the Lengiprotrans project in the 1980s.