In the 1950s-1960s, Lengiprotrans developed a project to adapt the locomotive depot at Riga station for diesel traction for train traffic in the direction of Shkirotava station.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Kaliningrad refrigerated wagon depot is intended for servicing insulated trains with mechanical cooling. The depot project was developed by the Lengiprotrans Plants Department in 1950-1980.
The Magnitogorsk depot is located at the station of the South Ural railway. In the 1960s – 1970s, Lengiprotrans developed a project for the reconstruction of the depot in connection with the...
Leningrad Institute of Railway Engineers named after Academician V.N. Obraztsova (LIIZhT, now the Emperor Alexander I St. Petersburg State Transport University, PGUPS) is a higher technical...
In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...
Finlyandsky railway station was built in 1870 for the railway connecting St. Petersburg with the Grand Duchy of Finland. During the years of the blockade, it was the only operating station: the "...
Pages