Throughout its entire activity, Lengiprotrans has taken care not only of production areas, but also of the well-being of its employees. In this regard, a number of projects for residential...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Polotsk is a station of the Belarusian railway in the city of the same name. From here the trains follow in the directions to the stations: Vitebsk, Daugavpils, Molodechno, Nevel.
In the 1970s...
Since the 1950s, Lengiprotrans has been developing a project for the West Karelian line, now part of the Oktyabrskaya railway. The transport development of the Karelian Autonomous Soviet Socialist...
In the 1950s, Lengiprotrans developed a project for the Avtodetal plant for the manufacture of spare parts for cars at the Gryazi station of the South-Eastern Railway.
The enterprise was...
Lengiprotrans has been involved in the reconstruction and development of the Kaliningrad railway junction for decades, starting from the post-war period.
In 1951, the institute designed the...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for the restoration of the central boiler house at the Kaliningrad station.
Later, in 1970-1979, the...
Pages