The Leningrad-Pavlovsk railway line is a section of the Vitebsk line of the Oktyabrskaya railway. In 1837, the Tsarkoselskaya railway was built here - the first public railway line in Russia....
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) continued to work in Kazakhstan. In 1948-1955, the electrical interlocking of forty-nine turnouts was developed at the Bolshaya...
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. So, by the mid-1950s, a project was developed for plumbing workshops in Akmolinsk (since 2019 -...
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. In the post-war years, according to his project, production facilities were built for...
The Mikun - Syktyvkar railway line is a dead-end branch of the Northern Railway. In the late 1950s, the USSR government decided to build it. The project of the line was developed by the...
The railway station in Konigsberg (now Kaliningrad) was conceived at the end of the 19th century. This was implemented in the 1920s.
Throughout almost the entire Second World War, the station...
Pages