In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) continued to work in Kazakhstan. In 1948-1955, the electrical interlocking of forty-nine turnouts was developed at the Bolshaya...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Караганда-Новая (ныне Жана Караганды) — станция в Карагандинской области Казахстана.
В ходе развития железнодорожной сети Казахской ССР «Ленгипротранс» разработал проект электрической...
For a long time Lengiprotrans has been developing and improving the railway network in Lithuania. In the period 1946-1955, the institute designed route control devices at 15 stations of the...
Virbalis - Kaliningrad is a railway section passing through the territory of Lithuania and Russia.
In the period 1946-1955, Lengiprotrans developed a semi-automatic blocking on the site. This...
Rybatskoye - Polyany - a section on the Volkhovstroevsky direction of the October railway.
In the post-war period, Lengiprotrans developed projects for the restoration of destroyed signaling...
Makushino - Omsk - Novosibirsk is a section that is part of the South Ural and West Siberian railways.
During the Great Patriotic War, the specialists of Lentransproekt (since 1951 -...