Since its inception, Lentransproekt (since 1951 - Lengiprotrans) has been involved in the transport development of the Kazakh SSR. First of all, the railways were intended for the development of...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The department of factories of Lentransproekt (since 1951 - Lengiprotrans) developed a project of a track repair and mechanical plant of the Ministry of Railways (MPS) in Pushkin. It is organized...
The Mikun - Syktyvkar railway line is a dead-end branch of the Northern Railway. In the late 1950s, the USSR government decided to build it. The project of the line was developed by the...
Since its inception, Lentransproekt (since 1951 — Lengiprotrans) has been involved in the transport development of the Kazakh SSR. In the 1950s, the Kostanay — Tobol — Dzhetygara railway line was...
The Pechora railway station is located at the station of the Northern Railway. The settlement here was formed as a result of the construction of the North-Pechora railway, intended for the export...
Gulbene station is located in the north-east of Latvia. It is combined and serves both the Plavinas - Gulbene broad gauge line and the Gulbene - Aluksne narrow gauge line.
The station was built...
Pages