Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 2020 — 2029
Сортировочная станция Шонгуй
In December 2020, JSC Lengiprotrans completed the development of pre-design documentation for the Shongui Yard. The basis for the deployment of the design work was the instruction of the...
  • 2020 — 2029
Вокзальный комплекс Кострома
In 2020, at a meeting between the Governor of the Kostroma Region and the General Director of Russian Railways, an agreement was reached on the technical re-equipment of the Kostroma station...
  • 2020 — 2029
Железнодорожный мост через реку Колу
Design and survey work on the construction of the new railway bridge began immediately after the collapse of the span of the old structure on June 1, 2020, under the influence of the abundant...
  • 2010 — 2019
Стационарное учреждение социального обслуживания «Психоневрологический интернат»
According to the results of the competition of theConstruction Committee, won in 2016, Lengiprotrans completed design work for the construction of a stationary institution of social services "...
  • 2010 — 2019
Грузовой состав с локомотивом 3ТЭ10мко на путях у станции Юктали (фото: rzd.ru)
The construction of the Baikal-Amur Mainline (BAM) can rightfully be called a significant achievement of transport construction at the end of the 20th century. The specialists of Lengiprotrans...
  • 2010 — 2019
Съемка на перегоне Балбухта — Новая Чара из кабины локомотива (фото: rzd.ru)
The construction of the Baikal-Amur Mainline (BAM) can rightfully be called a significant achievement of transport construction at the end of the 20th century. The specialists of Lengiprotrans...
Pages