In 1950-1970s one of the main directions of the Department of Plants (now as part of the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans was the design of...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. One of these objects, the railway crossing through the Kaunas hydroelectric complex, was...
In the 1950s – 1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
Locomotive depot Petrozavodsk (TCh-24) is located in the capital of the Republic of Karelia and is part of the Oktyabrskaya railway. It was founded back in 1916.
In 1959, a massive replacement of...
The Yaroslavl railway junction is a large junction of the Northern Railway (SZD). Here, in Yaroslavl, is the headquarters of the SZD.
In 1950-1970s Lengiprotrans developed the general layout of...
In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...