In the late 1990s, Lengiprotrans developed a project for a multi-unit depot at the Metallostroy station, intended for servicing and repairing the ER2T electric trains of the Moscow and Vitebsk...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1997-2003, Lengiprotrans developed a project for the completion and reinforcement of sections of the Nadym - Pangody - Novy Urengoy - Korotchaevo railway line in the Yamalo-Nenets Autonomous...
The Luga - Pskov railway line is a section of the Warsaw direction of the Oktyabrskaya railway, passing through the Leningrad and Pskov regions.
The project of dispatching centralization of the...
In 1997-1998, on the instructions of A / S "Venced", the specialists of Lengiprotrans developed feasibility studies for the construction of Juras Park in the Ventspils railway junction, and in...
Engineers of Lengiprotrans have extensive experience in the design of transport facilities in the Far North. In the second half of the 1990s, during the construction of a road, the Institute's...
ТЧ-6 "Kryukovo" - a multi-unit depot at the Kryukovo station of the Oktyabrskaya Railway (OZhD). In the 1990s, Lengiprotrans developed a project for a depot, including a workshop for washing...
Pages