In the 1980s, Lengiprotrans began developing a project for the Obskaya - Bovanenkovo line, the northernmost railway in the world. The road was intended for the development of the Bovanenkovskoye...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the late 1980s and early 1990s, Lengiprotrans developed a project for an overpass along Ringtee Street across the Tartu-Pechora railway line in the city of Tartu.
A feasibility study was...
Irtyshskoe — Karasuk is a section of the West Siberian Railway and the Central Siberian Railway. It was designed by Lengiprotrans for the development of virgin lands in southern Siberia in...
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Strugi Krasnye Oktyabrskaya railway station.
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Lazarevka station in the city of Vyborg. The object is located in the industrial zone of the city, in the area of ...
In the 1980s, Lengiprotrans engineers designed various projects in the Baltics. Thus, by order of the Baltic Railway, Lengiprotrans has developed a project for a railway overpass in the town of...
Pages