In 1954, a large-scale development of virgin and fallow lands began in the Kazakh SSR and a number of adjacent regions. The Council of Ministers of the USSR adopted a Resolution on the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Bologoye - Riga railway line is the main direction of the meridional route associated with the delivery of goods to the seaport of the city of Riga.
In the period 1951-1955, Lengiprotrans...
The railway line Kozhva - Vorkuta is a section of the North Pechora railway (since 1959 as part of the Northern Railway). The main line was built according to the project of Lentransproekt (...
Konosha - Velsk - Kotlas is the southern section of the North-Pechora railway (since 1959 as part of the Northern Railway). The main line was built according to the project of Lentransproekt...
Since the 1950s, Lengiprotrans has been developing a project for the West Karelian line, now part of the Oktyabrskaya railway. The transport development of the Karelian Autonomous Soviet Socialist...
Since the 1950s, Lengiprotrans has been developing a project for the West Karelian line, now part of the Oktyabrskaya railway. The transport development of the Karelian Autonomous Soviet Socialist...
Pages