In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) actively developed new projects. One of them was the project of the Gomel steam locomotive repair plant of the USSR Ministry of...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1940s, Lentransproekt (since 1951 - Lengiprotrans) designed the restoration of the railway industry plants destroyed during the Great Patriotic War. In particular, a project was developed...
In the post-war years, Lentransproekt (since 1951 - Lengiprotrans) was actively developing new projects. The engineers paid special attention to the reconstruction of railway infrastructure...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) carried out design work to restore factories of various profiles. In particular, a project for the reconstruction of the Riga...
In 1940-1950s, the Department of Plants (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans was engaged in the restoration of the depot at the stations destroyed...
In the postwar years "Lentransproekt" (since 1951 - "Lengiprotrans") carried out design work on the reconstruction of factories and the design of new ones in order to restore the country's...