During the Soviet period Lengiprotrans took an active part in the development of transport infrastructure in the Baltic countries. A large number of artificial structures were reconstructed, in...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya — Bovanenkovo railway line. In particular, a locomotive depot was designed at the Obskaya station...
In the 1980s, Lengiprotrans prepared a design for a washing and steaming station for servicing the Mazeikiai oil refinery at the Bugeniai station of the Lithuanian railway.
At the facility, the...
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya - Bovanenkovo railway line. In particular, the production base of the Yamaltransstroy trust was designed...
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya - Bovanenkovo railway line. In particular, the production base of the Mostostroy-6 trust was designed....
Engineers of Lengiprotrans worked on various transport facilities in the Baltics. The railway crossing through the Klaipeda Canal — one of such objects — was designed to provide the necessary...
Pages