In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) actively developed new projects. One of them was the construction project of the Gomel Electrotechnical Plant for the production...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1940-1950s, the Department of Plants (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans was engaged in the restoration of the depot at the stations destroyed...
Immediately after the end of the Great Patriotic War, the Department of Plants of "Lentransproekt" (since 1951 - "Lengiprotrans") developed a project for the restoration of a steam locomotive...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) actively developed new projects. One of them was the project of the Gomel steam locomotive repair plant of the USSR Ministry of...
Luga station is located at the station of the same name on the Oktyabrskaya railway.
The building was built in the 1850s on the Petersburg-Warsaw railway. During the Great Patriotic War, the...
Jelgava is a junction station on the Riga-Jelgava line of the Latvian Railway.
In 1940-1950s, the Department of Plants (now the Department of Industrial and Civil Buildings and Structures) of...
Pages