Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
  • 2000 — 2009
Комплексная реконструкция направления Мга — Гатчина — Ивангород — Котлы — Калище
The railway line Mga - Gatchina - Ivangorod - Kotly - Kalische is a section of the Oktyabrskaya railway passing through the territory of the Leningrad region. The road provides transport and...
  • 1970 — 1979
Диспетчерская централизация на участке Кустанай — Урицкое
Railway line Kostanay (now Kostanay) - Uritskoye - a section of the railway Kostanay - Kokchetav (now Kokshetau), designed by Lengiprotrans for the development of virgin lands in the Kazakh SSR...
  • 1950 — 1959
Укрепление земляного полотна на участке Черняховск — Железнодорожный
In the 1950s, Lengiprotrans developed a project to strengthen the roadbed on the Chernyakhovsk - Zheleznodorozhny railway section in the Kaliningrad region.
  • 1970 — 1979
  • 1980 — 1989
Переустройство участка Петрашюнай — Радвилишкис на колею 1520 мм
The railway line Petrasiunai (Pakruojis) - Radviliskis is a section of the Lithuanian railways. In the Baltic republics of the USSR, narrow-gauge railways prevailed, which complicated their...
Pages