In 1960-1970s Lengiprotrans designed a road bridge across the Khani River as part of the construction of the Baikal-Amur Mainline (BAM). The structure is located at 447 km of the BAM. Along the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Ventspils is a deep-water ice-free port on the Baltic Sea coast in Latvia. Port terminals handle oil products, liquid chemical products, coal, metal, minerals, timber, grain, containers and other...
The Kokchetav (Kokshetau) - Kzyl-Tu railway line is a section of the Kazakhstan railway. The project of the second tracks on the site was developed by Lengiprotrans by decree of the Central...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
In 1967 Lengiprotrans was...
Riga railway junction is the main railway junction in Latvia, connecting the railway with the seaport on the Baltic coast. The most intensive traffic is carried out in the following directions:...
In the 1970s – 1980s, Lengiprotrans developed a project for second tracks with electrification on the Kokchetav (now Kokshetau) - Tselinnye Sands - Presnogorkovskaya section by decree of the CPSU...
Pages