Alytus is a railway station on the Šeštokai - Alytus line of the Lithuanian Railway.
In 1978 Lengiprotrans carried out design and survey work at the station. Longitudinal and transverse...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950–1960, the electrification of the suburban sections of the Leningrad railway junction was widely carried out in accordance with the 1956 decree "On the general plan for the electrification...
In the Soviet period, in order to increase the country's construction capacity, Lengiprotrans took part in the creation of new diversified factories. So, in the 1970s, the Department of Plants of...
The line Leningrad-Sortirovochny-Moskovsky - Ruchyi - Pargolovo - suburban sections of the Leningrad railway junction, is part of the Oktyabrskaya railway.
In the 1970s, according to the...
The passenger stop "Prospekt Slavy" is located on the Vitebsk line of the Oktyabrskaya railway within the boundaries of the St. Petersburg railway junction. Suburban electric trains pass through...
Over the years, Lengiprotrans has been involved in the reconstruction of the Moscow railway station — from a large-scale reconstruction in the 1950s to preparations for meeting guests on the 300th...
Pages