Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
  • 1940 — 1949
Вторые пути на участке Котельнич — Пермь
Kotelnich - Perm - the railway section of the Kotelnich - Sverdlovsk (now Yekaterinburg) line of the Gorky Railway. In the 1930s, the Kirov and Molotov expeditions of Lentransproekt specialists...
  • 1935 — 1939
  • 1940 — 1949
Пермский железнодорожный узел
The Perm railway junction is a transit junction of the Perm branch of the Sverdlovsk railway, providing transportation of goods and passengers. In 1935 Lentransproekt (since 1951 -...
  • 1935 — 1939
  • 1940 — 1949
Магнитогорский железнодорожный узел
  • 1935 — 1939
  • 1940 — 1949
Барнаульский железнодорожный узел
  • 1940 — 1949
  • 1950 — 1959
Электрификация участка Кизел — Пермь
Railway line Kizel - Perm - a section of the Sverdlovsk railway. In the late 1940s, Lentransproekt (since 1951 - Lengiprotrans) developed a project for its electrification. During the design,...
  • 1940 — 1949
Вокзал на станции Кокчетав
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for a station at the Kokchetav (now Kokshetau) station of the Karaganda railway. The exterior and interior...