In the 1980s, the Architectural and Construction Department (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans designed a large number of multi-profile...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, Lengiprotrans developed projects for 3 bridge crossings over the Nyukzha River on the highway along the Baikal-Amur Mainline:
• at 286 km of the road;
• at 307 km in the area of ...
In the 1980s, the Architectural and Construction Department (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans designed a large number of multi-profile...
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Strugi Krasnye Oktyabrskaya railway station.
In the 1980s, Lengiprotrans developed a project for the production base for the construction and assembly train 675 of the Sevzaptransstroy trust in Tallinn.
At the facility, the following were...
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Lazarevka station in the city of Vyborg. The object is located in the industrial zone of the city, in the area of ...
Pages