In the 1970s, Lengiprotrans developed a project to rewire the Pärnu - Mõisaküla narrow-gauge section to the 1520 mm wide gauge line with access to the Riga - Aloa - Myizaküla broad gauge line....
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Siverskaya - Luga railway line is a section of the Varshavskaya line of the Oktyabrskaya railway.
The project of the second tracks on the section with electrification was developed by...
In 1970-1980, Lengiprotrans developed a project for rebuilding the narrow-gauge line Svencheneliai - Utena - Panevezys to a wide track of 1520 mm.
In the course of the work, geotechnical...
The Inta - Pechora - Rybnitsa railway line is part of the Northern Railway. Lengiprotrans has developed a project of the second tracks on this section to increase the capacity on the instructions...
In the 1970s Lengiprotrans took part in the development of the external transport system of the Kostomuksha Mining and Processing Plant (GOK). One of the first projects was developed for the...
Railway line Galich - Soligalich - section of the Monzenskaya railway. This is the largest departmental railway in Russia, owned by Monzazheltrans LLC (it includes the Monzensky DOK, the...