In 1960-1980, Lengiprotrans designed a wastewater treatment plant for a locomotive depot at Tallinn-Kopli station in Estonia.
The facility has developed: cross-sections, construction part,...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1960s, Lengiportrans, together with specialists from the Baltic Railway, developed a scheme for traction service of trains with diesel locomotives. Taking into account this scheme, a diesel...
In the first half of the 1960s, Lengiprotrans participated in the development of projects for buildings and structures on the Latakia - Oronte and Kamyshli - Aleppo - Oronte railways under...
In the 1950s – 1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
Locomotive depot Petrozavodsk (TCh-24) is located in the capital of the Republic of Karelia and is part of the Oktyabrskaya railway. It was founded back in 1916.
In 1959, a massive replacement of...
In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...
Pages