Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
Внешний железнодорожный транспорт порта Усть-Луга
The Ust-Luga Commercial Sea Port is located in the Leningrad Region, in the Luga Bay of the Gulf of Finland of the Baltic Sea. The construction of the port began in the 1990s with the aim of...
  • 1990 — 1999
Железнодорожный транспорт терминала химических грузов
In the late 1990s - early 2000s, Lengiprotrans designed railway approaches to the Vysotsk seaport. A project was developed for railway transport of the terminal for reloading liquid ammonia and...
  • 2000 — 2009
Соединительная ветка Высоцк — Нефтяная
В конце 1990-х — начале 2000-х годов «Ленгипротранс» осуществлял проектирование железнодорожных подходов к морскому порту Высоцк. Одним из основных объектов стала соединительная ветка Высоцк —...
Pages