In the 1970s, Lengiprotrans developed a project for electrical interlocking with mechanization of the hump at Ülemiste station of the Estonian Railways. The object contains 151 arrows, 2 beams of...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The railway section Polotsk - Vitebsk is part of the Belarusian Railway.
In the 1970s, the Department of Automation, Telemechanics and Communications of Lengiprotrans developed an author's...
In the 1970s, Lengiprotrans developed a project for dispatching centralization of the frequency system on the Kraslava - Daugavpils railway section, which connected the Belarusian and Latvian...
In the 1970s, Lengiprotrans developed a project for automatic blocking on the Kaisiadoris - Palyamonas - Gaizhunai section of the Lithuanian Railway. The object contains 20 arrows.
In the 1960s-1970s, Lengiprotrans developed a project for remote control of the fencing of trains at the Shkirotava station in Latvia.
Also at the station, the institute designed:
• adaptation...
In the 1960s, Lengiprotrans developed a project for the Balkhash - Sayak railway line in the Kazakh SSR. Transport links were required to supply Sayak ore to the Balkhash mining and metallurgical...
Pages