Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
  • 1940 — 1949
Кировский железнодорожный узел
The Kirov railway junction is located on the northern and new direction of the Trans-Siberian Railway. Passenger and freight traffic of the boiler, Glazov and Kotlas directions passes through it...
  • 1935 — 1939
  • 1940 — 1949
Вторые пути на участке Котельнич — Пермь
Kotelnich - Perm - the railway section of the Kotelnich - Sverdlovsk (now Yekaterinburg) line of the Gorky Railway. In the 1930s, the Kirov and Molotov expeditions of Lentransproekt specialists...
  • 1935 — 1939
Железнодорожная линия Караганда — Балхаш
In the pre-war period, Lentransproekt (from 1951 — Lengiprotrans) designed the Karaganda-Balkhash railway line in the Kazakh SSR. The road is a continuation of the meridional highway Petropavlovsk...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Алма-Ата
  • 1935 — 1939
Дарницкий вагоноремонтный завод Южной железной дороги
In 1935 "Lentransproekt" (since 1951 - "Lengiprotrans") worked on the creation of railway facilities in the Ukrainian SSR. The project of the Darnitsa Car Repair Plant, one of such facilities, was...
  • 1935 — 1939
Лианозовский вагоноремонтный завод
The Lianozovo Carriage Repair Plant (VRZ) was built near Moscow near the former village of Lianozovo in the 1930s. It was intended for the repair of four-axle passenger cars in the amount of 1,500...
Pages