Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Развитие и переустройство сортировочной станции Даугавпилс II
Daugavpils II is a sorting railway station of the Latvian Railway. Through it, trains follow in the direction of the stations: Krustpils, Rezekne, Egleine, Indra. In the period 1956-1970,...
  • 1950 — 1959
Внутрипортовые железнодорожные пути в Лиепае
Liepaja port is the largest ice-free port in Latvia. The seaport handles a large volume of various cargo: oil products, metal, timber, coal, chemical cargo, scrap metal. In 1950-1960s "...
  • 1950 — 1959
  • 1960 — 1969
Электрификация участка Рига — Огре
Railway line Riga - Ogre - section of the line Riga - Aizkraukle - Krustpils of the Latvian Railway. In the late 1950s - early 1970s, the Riga - Aizkraukle section, the longest electrified line...
  • 1950 — 1959
  • 1960 — 1969
Железнодорожный техникум в Акмолинске
In the 1950s – 1960s, Lengiprotrans designed new railway lines for the development of virgin lands in Kazakhstan. The capital of the republic Akmolinsk (now Astana) became the center of railway...
  • 1950 — 1959
Внутрипортовые железнодорожные пути в Риге
The Port of Riga is a large ice-free port in the capital of Latvia. Most of the cargo turnover is made up of transit cargo, the main of which are: coal, oil products, timber and container cargo...
  • 1950 — 1959
  • 1960 — 1969
Даугавпилсский завод сборных железобетонных конструкций треста «Балттрансстрой»
In 1950-1970s Lengiprotrans developed a project for the reconstruction of the Daugavpils plant of prefabricated reinforced concrete structures of the "Balttransstroy" trust. In 1980-1987,...
Pages