In the 1950s – 1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Nyandoma diesel locomotive depot is located on the Konosha - Arkhangelsk line, which is part of the Northern Railway (SZD). At present, it is divided into the operational locomotive depot TChE...
The Bui depot is located at the station of the same name on the Northern Railway. It was formed as a locomotive depot in 1905.
In the 1960s, Lengiprotrans developed a project for the...
In the 1950s-1960s, Lengiprotrans developed a project to adapt the locomotive depot at Riga station for diesel traction for train traffic in the direction of Shkirotava station.
The Magnitogorsk depot is located at the station of the South Ural railway. In the 1960s – 1970s, Lengiprotrans developed a project for the reconstruction of the depot in connection with the...
In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...
Pages