The Velikie Luki Steam Locomotive Car Repair Plant (PVRZ) is an enterprise for the repair of various freight cars for the needs of railway transport. Its history begins with the arrival of the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Kirov railway junction is located on the Gorkovskaya railway and is part of the Trans-Siberian Railway. Passenger and freight traffic of the boiler, Glazov and Kotlas directions passes through...
In the 1990s, Lengiprotrans developed a project for the electrification of the single-track section Chudovo - Novgorod (since 1999 - Veliky Novgorod) of the Oktyabrskaya Railway. Here, for the...
Railway line Melnichny Ruchey - Nevskaya Dubrovka - a section of the Irinovskaya direction of the Oktyabrskaya Railway (OZhD).
The section Melnichny Ruchey - Nevskaya Dubrovka was electrified...
The Tosno - Malaya Vishera - Bologoye - Likhoslavl - Klin railway line is part of the Oktyabrskaya Railway.
The project for the electrification of the line was developed by Lengiprotrans in the...
The Belomorsk - Loukhi - Kandalaksha railway line is part of the Oktyabrskaya railway. The specialists of Lengiprotrans have developed a project for the electrification of this section.
The...
Pages