For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. In the 1980s, the institute developed a project for the Tartus-Latakia line for operational...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Vyritsa — Orsha railway line is a section that is part of the Oktyabrskaya and Belorusskaya railways.
The project of the second tracks on the line was prepared by Lengiprotrans in the 1980s...
Railway line Roshchino - Vyborg - a section of the Vyborg direction of the Oktyabrskaya railway.
In the 1980s Lengiprotrans developed a project for second tracks on the electrified section.
In the 1990s, the Department of Industrial and Civil Buildings and Structures of Lengiprotrans designed the overlap of passenger platforms and a distribution site at the Moscow-Passenger...
Station "Ladozhskaya" is located on the Right Bank line of the Petersburg metro. It is a single-vaulted deep station (depth about 61 m).
In the 1980s, during the period of intensive development...
Railway section Ekibastuz II - Stopping point 116 km is part of the Ekibastuz railway junction. He was engaged in design work on the reconstruction and development of the Lengiprotrans unit for a...
Pages