In the 1950s, Lengiprotrans developed a project for the Avtodetal plant for the manufacture of spare parts for cars at the Gryazi station of the South-Eastern Railway.
The enterprise was...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950-1960s Lengiprotrans developed a project for a railway post office in Riga. At this facility, for the first time in the transport architecture, a large-span folded prefabricated reinforced...
Throughout its entire activity, Lengiprotrans has taken care not only of production areas, but also of the well-being of its employees. In this regard, a number of projects for residential...
Throughout its entire activity, Lengiprotrans has taken care not only of production areas, but also of the well-being of its employees. In this regard, a number of projects for residential...
Carrying out a complex of engineering surveys requires a large number of equipment and vehicles. In this regard, in 1950-1960, specialists from the Architectural and Construction Department...
Leningrad Institute of Railway Engineers named after Academician V.N. Obraztsova (LIIZhT, now the Emperor Alexander I St. Petersburg State Transport University, PGUPS) is a higher technical...
Pages