Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
  • 1940 — 1949
Псковский железнодорожный узел
The Pskov railway junction is a large junction of the October railway. In 1940 Lentransproekt (since 1951 - Lengiprotrans) developed the general scheme of the Pskov junction to increase...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Семипалатинск
  • 1935 — 1939
  • 1940 — 1949
Рижский железнодорожный узел
In 1930-1940s Lengiprotrans developed the general layout of the Riga railway junction. It was of strategic importance for the economic development of the Republic of Latvia and the Soviet Union as...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Акмолинск
Since its founding, Lentransproekt (since 1951 — Lengiprotrans) has been engaged in the transport development of the Kazakh SSR for the development of areas of fallow virgin lands and deposits on...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Алма-Ата
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Бертыс
Pages