In the 1970s – 1980s, Lengiprotrans engineers worked on various transport facilities in Estonia. One of such objects, the pedestrian bridge across Oktyabrsky Prospekt in the III microdistrict of...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Baikal-Amur Mainline (BAM) is the largest railway running through the territory of Eastern Siberia and the Far East in the direction of Taishet - Sovetskaya Gavan.
In 1960-1970s "...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
In 1960–1970,...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
The Institute took part...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
In 1967 Lengiprotrans was...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
In 1960–1970,...
Pages
- 1
- 2