In 1970-1980, Lengiprotrans developed a project for mechanization of the hump with the modernization of hump automation and electrical centralization at the Radviliskis station of the Lithuanian...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1976-1980, Lengiprotrans developed a project for laying cable communication lines on the Pärnu Gruzovaya - Pärnu-Passenger section in Estonia.
In the 1970s, Lengiprotrans prepared a project for electrical interlocking at Liiva station for 30 switches. A compressor station and a transformer substation were designed at the station.
Railway line Kraslau (now Kraslava) - Daugavpils - a section of the Indra - Daugavpils line of the Latvian Railway.
Dispatch centralization for 28 switches on the Kraslau - Daugavpils section...
In the 1970s, Lengiprotrans developed a project for route-relay electrical interlocking (EC) for 85 switches at Daugavpils II station.
The railway line Bigosovo - Kraslava is a section connecting the Belarusian and Latvian railways.
In the 1970s, Lengiprotrans designed a dispatch centralization at the Bigosovo - Kraslava...