In the 2000s, Lengiprotrans developed a project for the reconstruction of a city-wide highway of continuous traffic on the section from the intersection of Krasniy Znameni Avenue and Nekrasovskaya...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The ring road around St. Petersburg (A118, KAD) is a federal highway passing through the territory of St. Petersburg and the Leningrad Region. The highway connects all the main highways going from...
At the end of the 1980s, Lengiprotrans developed a project for on-farm highways in the Smolensk Region within the framework of the Resolution of the Central Committee of the CPSU and the Council...
In the late 1980s, Lengiprotrans developed a project for on-farm highways in the Bryansk region within the framework of the Decree of the Central Committee of the CPSU and the Council of Ministers...
In 1960-1970s Lengiprotrans designed a road bridge across the Khani River as part of the construction of the Baikal-Amur Mainline (BAM). The structure is located at 447 km of the BAM. Along the...
The Leningrad - Petrozavodsk - Murmansk highway is one of the northernmost federal highways in Russia, partly beyond the Arctic Circle and goes to the border with Norway. The road connected two...
Pages