The bridge crossing over the Vashka River was developed within the framework of the design of the Karpogory - Vendinga railway line, which is part of the Belkomur meridional highway. The road should ensure the transportation of natural and mineral resources from the regions of the European North of the Russian Federation.
The structure is projected on 412 km of the line, 3 km from the Vending station.
Bridge length - 270 m, layout - 3x88 m.
In the 1990s, the construction of the bridge supports began.
In 2002, the construction of Belkomur facilities was suspended due to lack of funding. However, it is planned to resume the implementation of the project - it is included in the Transport Strategy of the Russian Federation and the Strategy for the Development of Railway Transport of the Russian Federation until 2030.