In the 1980s, Lengiprotrans engineers designed various projects in the Baltics. Thus, by order of the Baltic Railway, Lengiprotrans has developed a project for the reconstruction of a railway...
In the 1990s, Lengiprotrans developed a project for the reconstruction of overpasses and overpasses on the connecting railway tracks of the Cherepovets Metallurgical Plant. 8 structures were...
In the 1980s, Lengiprotrans began developing a project for the Obskaya - Bovanenkovo line, the northernmost railway in the world. The road was intended for the development of the Bovanenkovskoye...
The bridge crossing over the Vashka River was developed within the framework of the design of the Karpogory - Vendinga railway line, which is part of the Belkomur meridional highway. The road...
In the late 1980s, the introduction of high-speed traffic into the railway network began in Russia. The high-speed highway St. Petersburg - Moscow (VSM-1) became the top priority, the project of...
In the late 1980s and early 1990s, Lengiprotrans developed a project for an overpass along Ringtee Street across the Tartu-Pechora railway line in the city of Tartu.
A feasibility study was...
Pages