The construction of the Baikal-Amur Mainline (BAM) can rightfully be called a significant achievement of transport construction at the end of the 20th century. The specialists of Lengiprotrans...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The construction of the Baikal-Amur Mainline (BAM) can rightfully be called a significant achievement of transport construction at the end of the 20th century. The specialists of Lengiprotrans...
In the 2010s, Lengiprotrans developed a project for an overpass at the intersection of railways and a public highway in the Gatchinsky District of the Leningrad Region.
A three-span, two-lane...
In 2013, Lengiprotrans developed a project for the modernization of charging devices and testing brakes in the passenger and receiving and departure depot of the Shkirotava station of the Latvian...
Khovrino is a junction railway station on the main line of the Oktyabrskaya railway.
The project was implemented as part of the program for the development of transport and logistics centers (...
Bolderaja II is a sorting railway station in Riga, on the Zasulauks - Bolderaja line of the Latvian Railway. Here the sorting of freight cars is carried out in the directions to Bolderaja,...
Pages