Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 2020 — 2029
Железнодорожная линия Лосево — Каменногорск
The Losevo - Kamennogorsk railway line is a section of the Oktyabrskaya railway in the direction of Ruchyi-Petyayarvi - Kamennogorsk - Vyborg. Lengiprotrans has developed a project for the...
  • 2000 — 2009
Реконструкция железнодорожной линии Санкт-Петербург — Москва
The railway line St. Petersburg - Moscow runs through the territory of St. Petersburg and Moscow, Leningrad, Novgorod, Tver and Moscow regions. The population of the region served by the railway...
  • 2000 — 2009
Реконструкция линии Санкт-Петербург — Бусловская
At the turn of the 20th – 21st centuries, Russia began to actively introduce high-speed traffic into the railway network. Lengiprotrans has developed a project for organizing high-speed passenger...
  • 2000 — 2009
Вторые пути на участке Буй — Вологда
The Bui - Vologda railway line is part of the Northern Railway. In the early 2000s, Lengiprotrans developed a project for second tracks on the site in order to increase the throughput of the East-...
  • 1990 — 1999
  • 2000 — 2009
Достройка железнодорожной линии Надым — Пангоды — Новый Уренгой — Коротчаево
In 1997-2003, Lengiprotrans developed a project for the completion and reinforcement of sections of the Nadym - Pangody - Novy Urengoy - Korotchaevo railway line in the Yamalo-Nenets Autonomous...
  • 1990 — 1999
Второй главный путь на участке Шиповка — Пост 26 км
In the 1990s, Lengiprotrans developed a project for the second main track on the Shipovka - Post section of 26 km in the Kaliningrad railway. In the course of engineering surveys, mine workings...
Pages