Riga - Dubulti - Kemeri - railway section of the Tornakalns - Tukums II line.
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for electrification and the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Vologda — Cherepovets railway line — a section of the Northern Railway, was put into operation as part of the Obukhovo — Vologda line in 1905.
The project of the second tracks on...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) participated in the development of projects for both the capital restoration of units and stations destroyed during the Great...
Kostanay (now Kostanay) - Kokchetav (now Kokshetau) is a section of the Central Siberian railway in Kazakhstan. The line was designed by Lengiprotrans in the 1950s – 1970s for the development of...
The Kursk railway station was built in the 19th century at the terminal station of the Moscow-Kursk railway.
During the Second World War, when the city was occupied by German troops, the...
Back in the pre-war period, Lentransproekt (since 1951 — Lengiprotrans) started design and survey work on the Kartaly — Akmolinsk (now Astana) — Pavlodar line, which became an important link in...
Pages