Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
Автомобильная дорога Уренгой — Надым — Советский
In the 1980s, Lengiprotrans designed the Urengoy - Nadym - Sovetsky highway. The road starts from the Urengoyskaya main compressor station (GCS) in the area of ​​the city of Novy Urengoy and ends...
  • 1970 — 1979
Электродепо «Автово»
TCh-1 Avtovo is a depot on the Kirovsko-Vyborgskaya line of the Petersburg metro. This is the first metro depot in St. Petersburg, opened in 1955. In the 1970s, Lengiprotrans developed a...
  • 1960 — 1969
  • 1970 — 1979
Остановочный пункт Ленинский проспект
Stopping point Leninsky Prospekt is located on the Baltic (St. Petersburg - Kalische and St. Petersburg - Gatchina) and Luga (St. Petersburg - Gatchina - Siverskaya - Luga) directions of the...
  • 1980 — 1989
Пересадочная станция Рыбацкое
Rybatskoye is an intermediate railway station on the St. Petersburg - Volkhovstroy line of the Oktyabrskaya railway. Here there is a transfer from the railway to the station of the same name on...
  • 1980 — 1989
Автодорожный путепровод через улицу Субачаус в Вильнюсе
During the Soviet period, Lengiprotrans was actively involved in the design of transport infrastructure in the Baltics. This was largely due to the development of approaches to ports in the Baltic...
  • 1950 — 1959
  • 1970 — 1979
Диспетчерская централизация на участке Полоцк — Бигосово
The railway section Polotsk - Bigosovo is part of the Belarusian Railway. In the period 1956-1970, Lengiprotrans developed a project for centralization of dispatchers for 66 switches on the...
Pages