In the 1980s, Lengiprotrans engineers worked on a project to reconstruct a road bridge across the supply canal on the road to the Estonian State District Power Plant. This project was carried out...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The reconstruction of the bridge over the Narva River in the Estonian city of Narva was carried out according to the Lengiprotrans project.
Design and survey work began in 1985 when...
Railway line Belomorsk - Sumskiy Posad - section of the Oktyabrskaya railway. The line runs along the coast of the Onega Bay in the north-east of the Republic of Karelia.
The line was...
In the 1980s, Lengiprotrans developed a project for an overpass at the intersection of Krengolm Avenue with the railways of the Ministry of Railways in Narva.
At the facility, the following...
In the 1990s, the Department of Industrial and Civil Buildings and Structures of Lengiprotrans designed the overlap of passenger platforms and a distribution site at the Moscow-Passenger...
Danilov is a junction station for joining the genera of the current of the Northern Railway. The directions Moscow-Yaroslavskaya - Arkhangelsk and Danilov - Bui pass through it.
According to...
Pages