Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 2000 — 2009
Железнодорожный наливной комплекс на станции Приводино
Privodino is a railway station of the Northern Railway in the Kotlassky District of the Arkhangelsk Region. In December 2004, an oil loading complex was built at the station. Under the...
  • 1950 — 1959
Комсомольский завод сборных железобетонных конструкций
In 1954, the Lengiprotrans Plants Department developed a project for a precast concrete plant in Komsomolsk-on-Amur. Although the department was engaged in work on a plant of this profile for...
  • 1960 — 1969
Реконструкция производственной базы СУ-312 треста «Балттранстрой»
In the 1960s, Lengiprotrans developed a project for the reconstruction of the production base of the construction department No. 312 of the Balttranstroy trust in Kaliningrad.
  • 1980 — 1989
Завод железобетонных конструкций и деталей «Ленметростроя»
In the 1980s, Lengiprotrans developed a project for a plant of reinforced concrete structures and parts for Lenmetrostroy in the Kolomyaga industrial area of ​​St. Petersburg. The plant was...
  • 1990 — 1999
Цех технического обслуживания пассажирских вагонов на станции Калининград
In the 1990s, Lengiprotrans developed a project for a workshop for the maintenance of passenger cars at the Kaliningrad station. A building with utilities was designed for technical inspection of...