Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
Новгородский железнодорожный узел
In the 1970s, the Department of Hubs and Stations of Lengiprotrans developed a significant number of copyright objects for the development of railway junctions and marshalling yards. Among them, a...
  • 1960 — 1969
  • 1970 — 1979
Остановочный пункт Ульянка
The Ulyanka passenger stop is located on the 12th km of the Baltic line of the Oktyabrskaya railway. The directions St. Petersburg - Kalische and St. Petersburg - Gatchina-Baltiyskaya pass through...
  • 1970 — 1979
  • 1980 — 1989
Оборудование автоблокировкой участка Рыбацкое — Купчинская
Rybatskoye - Kupchinskaya is a section of the Southern Semicircle (also called the Second Port Branch) of the St. Petersburg railway junction, opened in 1930. In the 1970s-1980s, according to...
  • 1970 — 1979
Дом отдыха локомотивных бригад на станции Шкиротава
Škirotava is a railway station on the Riga - Daugavpils line of the Latvian Railway. In 1976, according to the Lengiprotrans project, a rest house for locomotive crews with 96 sleeping places...
  • 1970 — 1979
Диспетчерская централизация на участке Кустанай — Урицкое
Railway line Kostanay (now Kostanay) - Uritskoye - a section of the railway Kostanay - Kokchetav (now Kokshetau), designed by Lengiprotrans for the development of virgin lands in the Kazakh SSR...
  • 1940 — 1949
  • 1970 — 1979
Вильнюсский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway facilities destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and a...
Pages