In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) actively developed new projects. One of them was the project of the Gomel steam locomotive repair plant of the USSR Ministry of...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the post-war years, Lentransproekt (since 1951 - Lengiprotrans) was actively developing new projects. The engineers paid special attention to the reconstruction of railway infrastructure...
The Perm - Shalya - Sverdlovsk (now Yekaterinburg) railway line is the main section of the Kirov - Omsk highway, which provides the shortest transportation of goods from Siberia and the Far East...
The Dno is the junction station of the October railway. The directions St. Petersburg - Vitebsk and Rybinsk - Bologoye - Pechory-Pskovskie pass through it.
In 1940-1950, a power plant was built...
The Kirov railway junction is located on the Gorkovskaya railway and is part of the Trans-Siberian Railway. Passenger and freight traffic of the boiler, Glazov and Kotlas directions passes through...
The Leningrad Electrotechnical Plant (LETZ) of the USSR Ministry of Railways was established in the 1930s on the basis of the signaling and communication service workshops of the October Railway...