The railway line Magnitogorsk - Tobol - Zhelezorudnaya - Tselinograd (now Astana) is a double-track line, one of the most important transport routes of the Kazakh SSR. It provided transport links...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Danilov - Bui - Svecha railway line is a section of the Northern Railway. In 1960-1970, Lengiprotrans developed a project for the electrification of this section within the framework of the...
The railway line Karaganda - Tselinograd (now Astana) - Atbasar is a section of the Karaganda - Magnitogorsk meridional route, which provides transport links between Kazakhstan and the enterprises...
The railway line Leningrad - Moscow - Leninakan (now Gyumri) is a superhighway connecting the northwestern and central regions of the country with the Armenian SSR.
The line was electrified...
Railway line Piskarevka - Sosnovo - a section of the line St. Petersburg - Khiytola Priozersky direction of the Oktyabrskaya railway. The main line was built in the 1910s for transport links...
Railway line Riga - Ogre - section of the line Riga - Aizkraukle - Krustpils of the Latvian Railway.
In the late 1950s - early 1970s, the Riga - Aizkraukle section, the longest electrified line...
Pages