In the 1980s, Lengiprotrans began developing a project for the Obskaya - Bovanenkovo line, the northernmost railway in the world. The road was intended for the development of the Bovanenkovskoye...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, Lengiprotrans began developing a project for the Obskaya - Bovanenkovo line, the northernmost railway in the world. The road was intended for the development of the Bovanenkovskoye...
The project of a road bypass for Narva and Ivangorod with a bridge over the Narva River was developed by Lengiprotrans in the 1990s - early 2000s. During the implementation of the project, level...
In 2000, Lengiprotrans took part in the design of the overpass between Dunaysky Prospekt and the railway tracks of the Vitebsk direction of the Oktyabrskaya Railway. The overpass connected the...
St. Petersburg-Sortirovochny-Moskovsky is a large marshalling yard of the Oktyabrskaya railway, stretching in the southeast of the city from the central part and further beyond the Ring Road. It...
TCh-21 Volkhovstroy is a repair locomotive depot at the Volkhovstroy-I railway station in the Volkhov district of the Leningrad region.
In the 2000s, the locomotive depot was reconstructed...
Pages