Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
Мостовой переход через реку Нарва
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in the restoration of the destroyed transport infrastructure...
  • 1950 — 1959
Восстановление моста через реку Писса
In the 1950s, Lengiprotrans developed a project for the overhaul of the bridge over the Pissa River at 912 km of the Virbalis - Kaliningrad section of the Lithuanian Railway.
  • 1980 — 1989
Реконструкция моста через ручей Товарный
In 1981, Lengiprotrans developed a project for the reconstruction of a bridge over the Tovarny stream in 1981 as part of the track reconstruction of the Kaliningrad-Sortirovochny station.
  • 2000 — 2009
Пешеходный мост на станции Обухово
Obukhovo is a stopping point of the Oktyabrskaya railway, located within the boundaries of St. Petersburg. The bridge crossing connected the Frunzensky and Nevsky districts of the city and...