Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
  • 1950 — 1959
Электростанция на станции Дно
The Dno is the junction station of the October railway. The directions St. Petersburg - Vitebsk and Rybinsk - Bologoye - Pechory-Pskovskie pass through it. In 1940-1950, a power plant was built...
  • 1940 — 1949
Укрепление земляного полотна на линии Туапсе — Адлер
The Tuapse - Adler railway line is part of the North Caucasus Railway. This is a narrow strip, bounded on the left by the Caucasus Mountains and on the right by the Black Sea. The key problem on...
  • 1940 — 1949
  • 1950 — 1959
Энергоснабжение Кировского железнодорожного узла
The Kirov railway junction is located on the Gorkovskaya railway and is part of the Trans-Siberian Railway. Passenger and freight traffic of the boiler, Glazov and Kotlas directions passes through...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожная линия Петрозаводск — Суоярви
In December 1939, in connection with the outbreak of the Soviet-Finnish war, the Government of the USSR issued a task for the accelerated construction of the Petrozavodsk-Suoyarvi railway to...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожная линия Аляты — Сальяны — Астара
In the pre-war years, the engineers of Lentransproekt (since 1951 - Lengiprotrans) worked in Azerbaijan. According to their project, a single-track railway line was built on a steam locomotive...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Семипалатинск