In the 1970s Lengiprotrans developed a draft general layout for the Tallinn railway junction. A feasibility study for the development of the unit was prepared.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
During the Soviet period, Lengiprotrans took an active part in the design of new railway lines for the development of virgin lands in the Kazakh SSR. In the 1970s, the institute developed a...
Leningrad-Sortirovochny-Moskovsky (now St. Petersburg-Sortirovochny-Moskovsky) is the railway station of the Oktyabrskaya railway.
The station development project was developed by Lengiprotrans...
The Ekibastuz railway junction is a large junction on the Astana-Pavlodar line, in the Pavlodar region of Kazakhstan. The city of Ekibastuz is the center of a large fuel and energy complex, known...
For many years, Lengiprotrans has been designing the Virgin Railway, which runs through the territory of Northern and Central Kazakhstan. This was due to the development of virgin fallow lands...
Ventspils is a deep-water ice-free port on the Baltic Sea coast in Latvia. Port terminals handle oil products, liquid chemical products, coal, metal, minerals, timber, grain, containers and other...
Pages