The Strategy for the Development of Railway Transport in the Russian Federation until 2030 and the Transport Strategy of the Russian Federation provide for the construction of new express and high...
The page shows the objects of the selected type, the design of which was performed in the selected period
120
ongoing projects
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The development of the railway infrastructure of the Ust-Luga railway hub and on the approaches to it was dictated by the need to increase the volume of cargo transshipment at the Ust-Luga...
For the first time, Lengiprotrans began to consider the development of railway approaches to the port of Ust-Luga in 1992, when it took part in the development of the General Scheme for the...