Author's department:
Project Status:
Complex of works on survey and design of a road overpass
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. The design of a road bridge across the Narva River solved the transport problems of Narva and the Narva HPP. Thanks to the implementation of this project, a rational interchange of road traffic was organized, and a large overrun of urban transport was also eliminated.
Photo: Bridge crossing over the dam of the Narva hydropower plant (source: dreamstime.com)